Download Online Help
Print
|
|||||||
|
The user may choose the Called On option if they would like to have the Original E/C performed in conjunction with a Called On E/C. When the Called On E/C is attached to the Work Order, the original E/C is also attached to the Work Order automatically (recalled onto the Work Order). Manual Compliance of a P/N E/C will automatically write compliance for its associated Called On E/C. Note: The Child/ Dependent E/Cs interval should always match the interval of the Parent E/C's schedule. For example, if the Parent E/C is scheduled by 500 hours or 185 days, then the Child/ Dependent E/Cs schedule should be the same. Additionally, we recommend that the Plan E/C checkbox, via the Engineering Control, Schedule tab remains selected for the Child/ Dependent E/C to allow for Planning to observe the E/C. The following example shows the Called On option being utilized in the Engineering Control, Schedule Control tab, but has the same functionality for the Engineering Control, Schedule Controlled By tab. Note: P/N E/Cs can be called on by A/C E/Cs (where the A/C E/C being the driving EC), but A/C E/Cs can not be called on by P/N E/Cs (where the P/N E/C is the driving E/C)
Frequency (Freq) - The Called On E/C has a specific frequency number. For example, if the Frequency is set to '002', the Called On E/C will follow the Parent E/C only on its second frequency. So if the Parent E/C has a total frequency of '007', then the Called On E/C will follow only on the second Frequency for every occurrence. The Lower Level and Ovr checkboxes are also available. For more information, refer to the topic About the Lower Level and Override Checkboxes. Note: If the 'Called On' Freq field is set to '000', the Called On E/C will follow at every occurrence of the parent E/C. To view the set number of Total Frequencies of the Called On E/C, go to Engineering/Update/E/C, select the E/C, and select the Schedule Tab.
Each frequency represents one occurrence of the E/C. For example, if the E/C has 7 total frequencies and has already completed nine occurrences, then the current frequency will be two. If the Original E/C is to be performed in conjunction with a specific frequency of the Called On E/Cs total number of frequencies, specify that number in this field. Note: The user may utilize the Called On option with an unlimited number of E/Cs. |
|||||||
| Top of Page |
Download Online Help
Print
|
||||||