Called On At, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

The 'Called On At' option allows for a more flexible scheduling of E/Cs. The 'Called On' option allows the user to specify at what frequency that the original E/C is to be accomplished on an interval basis in relation to the Parent E/C.

Note: The Child/ Dependent E/Cs interval should always match the interval of the Parent E/Cs schedule. For example, if the Parent E/C is scheduled by 500 hours or 185 days, then the Child/ Dependent E/Cs schedule should match. Additionally, we recommend that the Plan E/C checkbox, via the Engineering Control, Schedule tab remains selected for the Child/ Dependent E/C to allow for Planning to observe the E/C.

The following example shows the Called On At option being utilized in the Engineering Control, Schedule Control tab, but has the same functionality for the Engineering Control, Schedule Controlled By tab.

Notice that when the Called On At option in the control drop down list is selected, a new field appears, the 'Start At' field.The Start At field allows the user to specify when a Called On association is to begin.

 

The following options/information is available in this window:
_________________________________________________________________________

Freq (Frequency)

If the original E/C is to be performed on an interval basis, use the Frequency Field. For example, if the Frequency is set to 02, then every 2nd time that the Parent E/C is attached to a Work Order, the Called On, or Child E/C, is also automatically brought onto the Work Order as well.

Note: If the 'Called On At' Freq field is set to '000' or '001', the Called On E/C will follow at every occurrence of the parent E/C.

Start At

The number specified in the Start At field will instruct the system to initiate the original E/C on the Control E/C's occurrence. Please note that this is not a Frequency number.

_________________________________________________________________________

The Lower Level and Ovr checkboxes are also available. For more information, refer to the topic About the Lower Level and Override Checkboxes.

In this example, the original E/C will start at the 3rd frequency (Start At field) of the Called On At E/C, which has a total of 7 frequencies. It will then count 2 (which is the number specified in the Called On At Control's Freq field) to be performed at the 5th frequency. Then, it will count 2, to be performed at the 7th frequency. Then, it will count 2, to loop to the 2nd frequency because the Called On At E/C has a total frequency of 7.

Note: The Called On At E/Cs total number of frequencies is specified in the Total Frequency field of its Schedule Tab.

If the Called On At E/Cs total number of completions (which is specified in the Completed No. Field of the Engineering Effectivity Override window) is greater than the number specified in the Start At field, the original E/C will be initiated in accordance with the Freq and Start At fields' relationship.

To explain this further, using the same example above, the Called On At E/C has a total frequency of 7 (specified on the Schedule Tab). It has completed 3 occurrences, so it is now on its 4th frequency against the A/C. If a Called On At E/C is added to the Schedule Control tab at this point, the system will use the Freq and Start At fields relationship to initiate the original E/C on the 5th frequency. Then, it will count 2, to be performed at the 7th frequency. Then, it will count 2, to loop to the 2nd frequency. The system will automatically compute this information, and have the original E/C initiated on the correct occurrence of the Called On At E/C, even if the Called On At E/C has a number of completions greater than its Total Frequency.

If the original E/C has a Repeat number that is less than or equal to the Repeat Number of the Called On At E/C, the occurrence of the original E/C will continue until its Repeat Number is met.

Note: The user may utilize the Called On and Called On At option with an unlimited number of E/Cs.

In This Section

About the Lower Level and Override Checkboxes

See Also

Engineering Control, Schedule Control Tab

Called On, via Engineering Control Schedule Control and Schedule Controlled By Tabs

Called On 1st, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

Called On Repeat, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

E/C To Be Activated, via Engineering Control, Schedule and Schedule Controlled By Tabs

E/C To Be Terminated, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

Terminated E/C if Terminated, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

Top of Page Download Online Help Print