Engineering Control Authorization, Schedule Controlled By Tab

The Engineering Control Authorization, Schedule Controlled By tab allows the user to view all the E/Cs that are to be called on by the currently selected E/C. If the currently selected E/C appears on the Schedule Control tab of another E/C based on a Called On relationship (or Called On At, Called On 1st, etc.) then that E/C will be listed here. The information in this window is a copy of the Engineering Control, Optional tab, and can be edited or updated with the appropriate security privileges.

Note: The Child/ Dependent E/Cs interval should always match the interval of the Parent E/Cs schedule. For example, if the Parent E/C is scheduled by 500 hours or 185 days, then the Child/ Dependent E/Cs schedule should match. Additionally, we recommend that the Plan E/C checkbox, via the Engineering Control, Schedule tab remains selected for the Child/ Dependent E/C to allow for Planning to observe the E/C.

To create a new 'Called On' option for an E/C, first the user must select the Schedule Controlled By Tab and then select the New but_new_small button to create a Called On option.

Fields will automatically become available as shown below. Click into the E/C field. The Drop Down Selection window appears. Select an E/C that will be a Child E/C of the Parent E/C selected.

The following options/information is available in this window:
_________________________________________________________________________

E/C

Shows the Child E/C the user is linking with the Parent E/C. This E/C's information can be viewed by selecting into its General Tab.

Note: The Child/ Dependent E/Cs interval should always match the interval of the Parent E/Cs schedule. For example, if the Parent E/C is scheduled by 500 hours or 185 days, then the Child/ Dependent E/Cs schedule should match. Additionally, we recommend that the Plan E/C checkbox, via the Engineering Control, Schedule tab remains selected for the Child/ Dependent E/C to allow for Planning to observe the E/C.

Control

The user can apply any combination of these options to an unlimited number of E/Cs. These options will be discussed in greater detail in the ensuing sections.

Called On - The user may choose the Called On option if they would like to have the Original E/C performed in conjunction with a Called On E/C. When the Called On E/C is attached to the Work Order, the original E/C is also attached to the Work Order automatically (recalled onto the Work Order). Manual Compliance of a P/N E/C will automatically write compliance for its associated Called On E/C. For additional information, refer to Called On, via Engineering Control Schedule Control Tabs via the Engineering - E/C Training Manual.

Called On 1st - The user may choose the Called On 1st option for the selected E/C to be called on one time only at a specified frequency of the Parent E/C. The original E/C will be performed one time only, on the frequency specified in the Start At field of the Called On First E/C. For additional information, refer to Called On 1st, via Engineering Control Schedule Control Tabs via the Engineering - E/C Training Manual.

Called On At - The user may choose the Called On At option to allow for a more flexible scheduling of the E/Cs to specify what frequency the selected E/C is to be accomplished on an interval basis in relation to the Parent E/C. For additional information, refer to Called On At, via Engineering Control Schedule Control Tabs via the Engineering - E/C Training Manual.

Called On Repeat - The user may choose the Called On Repeat option to set a frequency for the Called On 1st E/C. For additional information, refer to Called On Repeat, via Engineering Control Schedule Control Tabs via the Engineering - E/C Training Manual.

E/C To Be Activated - The user may choose the E/C To Be Activated option to set the selected E/C to be activated upon the compliance of the Parent E/C. For additional information, refer to E/C To Be Activated, via Engineering Control Schedule Control Tabs via the Engineering - E/C Training Manual.

E/C To Be Terminated - The user may choose the E/C To Be Terminated option to set the selected E/C to be terminated upon the compliance of the Parent E/C. For additional information, refer to E/C To Be Terminated, via Engineering Control Schedule Control Tabs via the Engineering - E/C Training Manual.

Note: When the status of the E/C is Open, or Applicable/ Not Embody, and compliance is manually written, the functionality of termination will still occur.

Terminated E/C If Terminated - The 'Terminated E/C if Terminated' function is a useful tool to prevent identical maintenance events from being carried out twice. For additional information, refer to Terminated E/C If Terminated, via Engineering Control Schedule Control Tabs via the Engineering - E/C Training Manual.

Lower Level checkbox

When this checkbox is selected, the system assumes that all lower level Task Card steps associated to a Child E/C are contained in the Parent E/Cs Task Cards. This feature is helpful when a Parent E/C includes tasks that are identical to tasks on the original or Child E/C. An engineering decision must be made to verify if the Parent E/Cs Task Cards contain the same steps of the Child E/C. No Task cards from the Child E/C will be added to the Work Order AT ALL.

Do not select this checkbox if you want the Task Cards to follow the Child E/C.

Note: When Switch MANLLOR is set to Yes, and the E/C is classified as 'Mandatory', the Lower Level and Override checkboxes will be disabled.

OVR checkbox (Override checkbox)

If selected, the system will verify if there is at least one compliance record that has been written for the original E/C related to the A/C (tail number) on the Work Order. If at least one compliance record exists, the system will not bring in the Task Cards of the original E/C. If a compliance record does not exist, the system will bring in the Task Cards (of the original E/C) for one time only and from that point forward, will not.

Note: When Switch MANLLOR is set to Yes, and the E/C is classified as 'Mandatory', the Lower Level and Override checkboxes will be disabled.

This checkbox is a customized request and the use of it is not recommended for most customers.

Frequency

If the original E/C is to be performed on an interval basis, use the Frequency Field. For example, if the Frequency is set to 02, then every 2nd time that the Parent E/C is attached to a Work Order, the Called On, or Child E/C, is also automatically brought onto the Work Order as well.

Called On but_override_small button

The E/C that the current E/C is calling on for it's schedule.

_________________________________________________________________________

Set up all Child E/Cs that are to be Called On and select the Save but_save_small button. The Save prompt appears. Select 'OK.'

The following options/information is available in this window:
_________________________________________________________________________

E/C Called On Schedule Exceptions but_ec_called_on_schedule_exceptions_small button

This button appears to indicate that there are differences in the schedule between the Child E/C and its Parent E/C. When the E/C Called On Schedule Exceptions but_ec_called_on_schedule_exceptions_small button is selected, the system displays the following pop-up:

_________________________________________________________________________

Note: Each E/C is allowed one 'Called On 1st' control function from the Control field drop down. The system will not allow the user to save if more than one of the functions has been set. The 'Called On 1st' E/C is also able to have its own 'Called On 1st' E/C.

Select the Delete but_delete button to delete a Called On for any E/C.

Note: When selecting the Called On but_ec_called_on button the following information message will appear if there are no Called On E/Cs for the E/C:

 

Additional Functionality:

The user will receive an error when attempting to produce a loop: when a Parent E/C calls on a Child E/C.

When trying to set up the Schedule Control to have the Parent E/C call on the Child E/C, the user receives an error.

See Also

Engineering Authorization Process

Engineering Control Authorization, General Tab

Engineering Control Authorization, Schedule Tab

Engineering Control Authorization, Schedule Control Tab

Engineering Control Authorization, Other Tab

Engineering Control Authorization, E/C Content Tab

Engineering Control Authorization, Optional Tab

Engineering Control Authorization, P/N Effectivity Control Tab

Engineering Control Authorization, Warranty Tab

Engineering Control Authorization, Affected Manuals Tab

Engineering Control Authorization, Authorization History Tab

Engineering Control Authorization, Location/Site Ban Control Tab

Engineering Control Authorization, Restrictions Tab

Engineering Control Authorization, Informational Tab

Engineering Control Authorization, Revision History Tab

Engineering Control Authorization, Vendor Restriction Tab

Engineering Control Authorization Buttons

Top of Page Download Online Help Print