Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

P/N E/C Position Controls

If a P/N E/C has Positioning Control, then the E/C is only effective to that P/N when the P/N is installed on the specified Aircraft Position (S/N's Status will be 'Open' in Override window). If the P/N is installed on a position that is not specified, then the E/C will not be effective for the part (S/N's Status will be 'N/A' in the Override window).

If a Position Change transaction takes place for an effective P/N E/C, but the new position is not configured for the P/N E/C, then the P/N will lose its P/N E/C effectivity. The S/N's Status in the Engineering Effectivity Override window will be 'N/A' (instead of 'Open').

 

logo_12_small switch edited PNECPOSCONT

Additionally, in Version 12, Receiving switch PNECPOSCONT allows P/N E/Cs with Position Controls to be available in Receiving.

PNECPOSCONT_Configuration

When set to Yes, the system will allow P/N E/Cs that have Position Controls to be available in the Receiving Inspection and Order Receiving window, and will give users the ability to update the Reset Date of the E/C.

Additionally, with the Switch set to Yes, the Inventory Planner will display P/N E/C parts that are not installed and have a N/A Status.

When set to No, the system will not allow P/N E/Cs that have Position Controls to be available inside the Receiving Inspection and Order Receiving window, thus not giving the ability to update the Reset Date of the E/C.

Refer to switch PNECPOSCONT for more information.

See Also

Positioning Control Button, via Engineering Control P/N, General Tab

Top of Page Publication Date: 8/17/2026 Share Print