Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Compliance Button, via Engineering Control Compliance

There are two types of E/C compliances: A/C E/C compliance and P/N E/C compliance. Compliance records are created for E/Cs when: the required work has been accomplished on a Work Order (Production or Shop); during the receipt of a P/N S/N on a Repair Order, Receiving Inspection; when a user writes manual compliance for work accomplished.

From the Engineering Control Compliance window, select the Compliance but_compliance_sm button a history of all compliance records associated with an E/C will display.

If required, users are able to edit/delete compliance records in this window. A compliance record however, can only be written via the A/C CTL or P/N CTL buttons via the Engineering Compliance window.

12_ComplianceButton(1)

Note: The user cannot update or edit the fields that are greyed out.

 

The following information/options are available in this window:
_____________________________________________________________________________________

Revision

The Revision of the E/C at the time of compliance.

Amendment

The Amendment of the E/C at the time of compliance.

Frequency Count

Displays at which frequency the E/C was complied on (out of the E/Cs total frequency, as defined in the E/C Schedule tab).

Order NO

The relevant Repair or Work Order Number the E/C was complied against.

Reset By

The user that accomplished the Work Order Closing (Production or Shop), receiving of the Repair Order, completion of Receiving Inspection, or Manual Compliance.

Reset Date

The date the E/C was complied with.

Reset Hour/Minute

The time this E/C was complied with.

Location

The location the E/C was complied at.

Employee

The Employee that conducted the E/C Compliance.

Document

The Document information entered in Manual Compliance.

Remarks

This field is used to enter any additional information regarding the compliance event. This is a free text field.

At A/C (or P/N) Total Hours

The total number of flight hours at the time of compliance.

At A/C (or P/N) Total Cycles

The total number of flight cycles at the time of compliance.

Created By

The user who created the record.

Created Date

The date the record was created.

Modified By

The user who last modified the record.

Modified Date

The date the record was last modified.

_____________________________________________________________________________________

When the E/C Compliance is associated to an Order, the Select but_select_small button can be used to view the Order in Query Mode to review the details of the actual Work Order or Repair Order.

The following buttons also offer additional functionality:

In This Section

Delete Button, via Engineering Compliance

Notes Button, via Engineering Compliance

Image Button, via Engineering Compliance

Document Control Button, via Engineering Compliance

Copy E/C Compliance Button, via Engineering Compliance

See Also

Engineering Control Compliance Buttons

Notes Button, via Engineering Control Compliance

Print Button, via Engineering Control Compliance

Document Button, via Engineering Control Compliance

A/C CTL Button, via Engineering Control Compliance

P/N CTL Button, via Engineering Control Compliance

Task Card CTL Button, via Engineering Control Compliance

Revision CTL Button, via Engineering Control Compliance

Image Button, via Engineering Control Compliance

MPD Button, via Engineering Control Compliance

Top of Page Publication Date: 8/17/2026 Share Print