Publication Date: 11/17/2026
Share
Print
|
||||||
Existing W/O Button, via Planning ControlUsers can add the selected tasks in the Due List window to an existing W/O by selecting the Existing W/O
The WO Selection window pops up. Work Orders for the same Aircraft that are Open and scheduled for the current date will be available for selection. Click the Select
A message appears confirming the items was linked to the selected W/O.
When item is queried again, this time with the Planned W/O checkbox selected, notice that the linked W/O is listed.
To review the W/O, or to unlink the item from the W/O (through the W/O's Workscope tab), select the W/O |
||||||
| Top of Page |
Publication Date: 11/17/2026
Share
Print
|
|||||