Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Labor Manual Button, via Work Order

The Labor Manual but_labor_manual_sm button allows the user to add time (labor) to individual and/or multiple Task Cards for any employee. This window is not user specific. This function can also be used to edit the time that it took to carry out a Task Card. This window keeps a record of every user that has put time against a Work Order Task Card, and allows the user to specify the Category of time and whether the time entry is manual.

From a Work Order, click on the Labor Manual but_labor_manual_sm button. The following window will appear. Enter the required Work Order and Task Card and select the Find but_find_small button.

The W/O Task Card Manual Labor window appears. The user may select the New but_new_small button to add time and/or labor to a work.

 

The following information/options are available in this window:
_____________________________________________________________________________________

W/O

The Work Order used to categorize, manage, and schedule work requirements for aircraft maintenance.

Task Card

The Task Card / Job Card that details the scheduled maintenance work.

Item

The individual Task Card Item number that manual labor has been added to. Users can assign manual labor to specific Task Card Items. Notice the Item field above and the Task Card Item field below are linked. When the Item number is '0', the manual labor will apply to all of the Items.

P/N

The Part Number reference for the aircraft part.

S/N

The Serial Number for the specific serialized part.

Employee

The employee performing the task.

Date

The date of the task.

Start Time

The time the labor started on the Task Card.

End Time

The time the labor ended on the Task Card.

Time (hrs/min)

The amount of time to be manually added. The maximum number of hours that can be input here is defined via System Administration/ Explorer/ System Transaction Configuration/ Production/ LABORTIM (Maximum Hours Allowed In Work Order Task Card Manual Labor).

Category radio buttons

The type of hourly work schedule being applied: Regular, Overtime, or D/T (Double time).

Skill

The appropriate skill used to perform the task.

Rego logo_11_small edited

This free-text field is used to indicate that the work is being re-done. If the required work was completed once, and must be re-done, this field along with the Comments field may be used as desired. This field is informational only.

Comments logo_11_small edited - This is a free text field where the user may enter any additional Rego comments. This field is informational only.

_____________________________________________________________________________________

Additional information can be viewed and included through the W/O Task Card Manual Labor, Informational Tab and the Notes but_notes_small button.

 

Assigning Manual Labor to T/C Items:

Users can assign manual labor to specific Task Card Items. Notice the Item field above is linked to the Task Card Item field below.

Note: This can only be done via the W/O Task Card Assignment Workshop window.

From the W/O Task Card Assignment Workshop window, select an item. Select the Labor Manual but_labor_manual_sm button.

The following window appears with the Item number defaulted to the highlighted item selected in the above window.

When the Item number is '0', the manual labor will apply to all of the Items.

 

Manual Labor and Closed Work Orders:

Manual labor cannot be added to closed Word Orders. For example, notice the below W/O is in 'Closed' Status. Select the Labor Manual but_labor_manual_sm button.

Select a Task Card then select the Find but_find_small button.

From the W/O Task Card Manual Labor window, the following warning messages blocks users from adding manual labor.

In This Section

Notes Button, via W/O Task Card Manual Labor

See Also

Work Order Buttons

Notes Button, via Work Order

Non-Routine Button, via Work Order

Non-Routine Express Button, via Work Order

Task Card Work Button, via Work Order

Control Button, via Work Order

Labor Stop Button, via Work Order

Airline Authorization Button, via Work Order

Actuals Button, via Work Order

Customer Invoice Authorization Search

Labor Active Button, via Work Order

Status Button, via Work Order

Cost Button, via Work Order

Sell Button, via Work Order

Balance Sell Button, via Work Order

N/R Analysis Button, via Work Order

Task Card Status Button, via Work Order

Tools Button, via Work Order

Gantt Button, via Work Order

Export to MS Project Button, via Work Order

Image Button, via Work Order

Document Control Button, via Work Order

Auto Line W/O Generation Button, via Work Order

Top of Page Publication Date: 8/17/2026 Share Print