W/O

The Production module is responsible for the creation and management of work conducted on aircraft mainframes. The Work Order is the main option used in the Production system. This is used to create and manage the work packs for the aircraft. This work can be categorically internal as well as third party.

Note: The Shop module is used for internal work (repairs, refurbishing, etc.) on off-wing parts.

An additional element of the Work Order functionality is it allows the company to analyze all time and costs involved in the work, giving a better understanding of the operation and the opportunity to improve in certain areas where cost and time are an issue.

Work can be planned effectively and work packs can be created quickly, avoiding labor intensive copying and sorting of Task Cards (Check Cards). Relevant information to the checks is produced along with the Check Pack to allow project management of the check.

Third Party capabilities allow management of projects for your customers, giving you full flexibility and control over your costs and charges to your customers. System invoicing is immediate, detailing all work carried out and any materials used. Additional billing can be added to include miscellaneous costs.

Finally, upon completion of Work Orders (checks, etc.), information is fed back to other modules in the system, such as Technical Records (for component information), Engineering (completions of inspections, AD's, SB's etc.) and the G/L Interface (for costing and billing).

Bar coding can be used for shop floor data collection, allowing online, real-time recording of work carried out. Graphical statuses of each check can be viewed while work is in progress. Management can easily see when work is ahead, on time, or behind schedule (actual versus estimates), along with the breakdown of costs involved.

Reports detailing work requirements and zone conflicts help to organize the check effectively. Panel removal sheets cut down time waste in removing/installing panels unnecessarily.

Included as part of the Production system is the interface to your financial system, this allows complete cost control on checks and dissemination of work in progress costs against work completed.

The typical life cycle of a Work Order goes through 6 status’:

_____________________________________________________________________________________

  1. GENERATION – the W/O is being created and tasks are being attached.
  2. PRE/AUTH - the W/O has been created and pending authorization. (This status is optional and controlled by switch WOATHREL.)
  3. OPEN – the W/O is authorized and available for users to action tasks, track man hours, and issue parts.
  4. COMPLETED – once all Task Cards attached to the W/O are actioned (closed, deferred, canceled) the W/O status automatically changes from Open to Completed.
  5. POSTCOMPLT (Post Completed) - compliance records are written for E/Cs, P/N E/Cs, P/N Controls, and defects, their repeat schedules reset, and unused material can be returned to stock to credit the W/O. (This status is optional and controlled by switch WOPOSTCM; Yes is the recommended configuration.)
  6. CLOSED – the W/O is finalized and the financials are closed. Unused material cannot be returned to stock to credit the W/O.

_____________________________________________________________________________________

 

The following tabs and buttons are available at the initial level.

Work Order Tabs

Work Order Buttons

General Tab

Other 1 Tab

Other 2 Tab

but_notes_small Notes button

but_new_small New button

but_find_small Find button

but_select_small Select button

but_nrtc_sm Non-Routine button

but_nr_express_small Non-Routine Express button

but_labor_manual_sm Labor Manual button

but_tc work (small) T/C Work button

but_engineering_small Control button

but_labor_stop_small Labor Stop button

but_contractor_auth_req Contractor Authorization Request button logo_12_small button edited

Actuals Multi buttons

but_actuals_sm Actuals button

but_labor_act_small Labor Active button

but_status_small Status button

but_cost_small Cost button

but_sell_small_green Sell button

but_balance_sell_small Balance Sell button

but_NR_analysis_small N/R Analysis button

but_task_card_status_small Task Card Status button

but_tools_small Tools button

but_gantt_small Gantt button

but_export_to_ms_project_small Export to MS Project button

but_image_small Image button

but_document_ctl_sm Document Control button

but_auto_line_wo_gen Auto Line W/O Generation button

For information on the options in the header level, refer to Work Order Detail.

This update window is also available in query mode where users can view the records provided in this window but cannot create new records or edit existing data. Refer to this module's Query menu.

Work Order Process

In This Section

Work Order, General Tab

Work Order, Other 1 Tab

Work Order, Other 2 Tab

Work Order Buttons

Work Order Detail

See Also

Production, Update Menu

Airline Authorization

Customer Addbill Master

Customer Authorization

Customer Contract

Employee Attendance Supervisor

Employee Sign-On/Sign-Off

Engineering Pending Release

W/O Addbill

W/O Audit

W/O Bid Sheet

W/O Closing

W/O Closing Post Completion

W/O Employee Auto Sign Off

W/O Manual Task Card Closing

W/O Reservation Control

W/O Task Card and Non-Routine Search

W/O Task Card Assignment

W/O Task Card Assignment Workshop

W/O Task Card Bust

W/O Task Card Bust Authorization

W/O Task Card Discrepancy Close

W/O Task Card Discrepancy Close Supervisor

W/O Task Card Work In Progress

W/O Task Card and Non-Routine Search

W/O Template

Work Turnover

Work Turnover Management

Work Order Sweep

Top of Page Publication Date: 8/17/2026 Share Print