Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Control Button, via Work Order

The Control but_ec_small button allows users to update the Engineering Control for the selected Work Order. If the dependency (i.e the Task Card) on this E/C has been completed, deferred, or canceled, updates to the following editable fields (Status, Function and Reset Date) can only be updated via this window. If the dependency has not been closed, updates to the E/C can be done via the Engineering Control but_ec_small button. For additional information, refer to the Engineering Control Button via the Work Order Header buttons.

The Control but_ec_small button is security controlled via Security Explorer/ Production/ Update/ W/O/ W/O Engineering Control Update. For additional information, refer to the Security Explorer via the System Administration Training manual.

 

The following information/options are available in this window:
_____________________________________________________________________________________

W/O

The Work Order used to categorize, manage, and schedule work requirements for aircraft maintenance.

Control

The Engineering Control or Part Number Control linked to the Work Order.

P/N

The Part Number reference for the aircraft part. This part is linked to the P/N E/C or P/N Control.

S/N

The Serial Number for the specific serialized part. This is the particular part linked to the P/N E/C or P/N Control.

Status

The current status of the E/C. For more information refer to the Engineering Control, General tab.

Function drop down

This field defines how the Control's times will be treated once its requirements are met. The Function drop down has three selections, including Reset, Do Not Reset, and Has Been Reset.

Reset - Reset the time controls to zero.

The Reset option is security controlled via the Security Explorer/ Production/ Update/ W/O/ Reset. For additional information, refer to the Security Explorer via the System Administration Training manual.

Do Not Reset - Do not reset the time controls to zero.

The Do Not Reset option is security controlled via the Security Explorer/ Production/ Update/ W/O/ Do Not Reset. For additional information, refer to the Security Explorer via the System Administration Training manual.

Has Been Reset - The time control has already been reset to zero.

The Has Been Reset option is security controlled via the Security Explorer/ Production/ Update/ W/O/ Has Been Reset. For additional information, refer to the Security Explorer via the System Administration Training manual.

Override Reset Date checkbox

Select this checkbox to override the E/Cs Reset Date. When this checkbox is selected, the Date and time fields will appear.

Reset Date/Time - Enter the E/Cs Reset Date and time. This field appears when the Override Reset Date checkbox is selected.

Daily checkbox

When the Daily checkbox is selected, actual hour/cycles (time) are reset and a compliance record is written for this E/C upon the completion of the Task Cards on an 'Open' Work Order rather than at the closing of the W/O. This feature is useful for the scheduling of recurrent daily E/Cs. (In this window, this checkbox is view only)

_____________________________________________________________________________________

Additional information can be included through the Notes but_notes_small button.

In This Section

Notes Button, via W/O Engineering Control Update

See Also

Work Order Buttons

Notes Button, via Work Order

Non-Routine Button, via Work Order

Non-Routine Express Button, via Work Order

Labor Manual Button, via Work Order

Task Card Work Button, via Work Order

Labor Stop Button, via Work Order

Airline Authorization Button, via Work Order

Actuals Button, via Work Order

Customer Invoice Authorization Search

Labor Active Button, via Work Order

Status Button, via Work Order

Cost Button, via Work Order

Sell Button, via Work Order

Balance Sell Button, via Work Order

N/R Analysis Button, via Work Order

Task Card Status Button, via Work Order

Tools Button, via Work Order

Gantt Button, via Work Order

Export to MS Project Button, via Work Order

Image Button, via Work Order

Document Control Button, via Work Order

Auto Line W/O Generation Button, via Work Order

Top of Page Publication Date: 8/17/2026 Share Print