|
TRAX MANUALS > Production > Production Module > Production, Update Menu > W/O > Work Order Buttons > Non-Routine Button, via Work Order
Non-Routine Button, via Work Order
If any damage or defect is discovered on the aircraft while working on the scheduled W/O Task Card, a Non-Routine Task Card can be created to address the issue. These N/R Task Cards work similarly to Engineering's scheduled Task Cards in that required materials, labor, and finances can be tracked, but N/R Task Cards are considered unplanned maintenance events.
This damage may be discovered at the beginning of a check. During the check, some routine Task Cards may find specific problems that may need some rectification action, which must be recorded on another card. These Non-Routine Task Cards are allocated a sequential number unique to each Work Order for tracking purposes. They do not have their own 'named' reference as the Task Cards do.
Non-Routine Task Cards can be added and created from other places within the System (not necessarily just from this window). An example of this is when the Non-Routine Task Cards are created in the Work In Progress Window and the Defect Report Window.
Users may add Non-Routine Task Cards to this list.
W/O Task Card Layout:
The W/O Non-Routine Task Card window divides the Task Card information into a header and a detail window.
When the Non-Routine Task Card button is selected from the Work Order window, the W/O Non-Routine Task Card header window displays header information for every N/R Task Card associated to the W/O.

Note: The Work Order Description has been added to the W/O Non-Routine Task Card window.
When a N/R Task Card is selected from the header window, the detail window comes up with more N/R Task Card information and tabs.
The following tabs and buttons are available.
|
In This Section W/O Non-Routine Task Card, General Tab W/O Non-Routine Task Card, Optional 1 Tab W/O Non-Routine Task Card, Optional 2 Tab W/O Non-Routine Task Card, Optional 3 Tab W/O Non-Routine Task Card, Optional 4 Tab W/O Non-Routine Task Card, Work Accomplished Tab W/O Non-Routine Task Card, Follow Up Requirements Tab W/O Non-Routine Task Card, Schedule Tab W/O Non-Routine Task Card, Authorization Tab W/O Non-Routine Task Card Buttons |
See Also Work Order Buttons Notes Button, via Work Order Non-Routine Express Button, via Work Order Labor Manual Button, via Work Order Task Card Work Button, via Work Order Control Button, via Work Order Labor Stop Button, via Work Order Airline Authorization Button, via Work Order Actuals Button, via Work Order Customer Invoice Authorization Search Labor Active Button, via Work Order Status Button, via Work Order Cost Button, via Work Order Sell Button, via Work Order Balance Sell Button, via Work Order N/R Analysis Button, via Work Order Task Card Status Button, via Work Order Tools Button, via Work Order Gantt Button, via Work Order Export to MS Project Button, via Work Order Image Button, via Work Order Document Control Button, via Work Order Auto Line W/O Generation Button, via Work Order |
|