Publication Date: 8/17/2026
Share
Print
|
|||||||||||
W/O Reservation ControlFollowing creation of the Work Order, any materials or labor that is required for the work can be automatically reserved. The system can generate Picklists for parts and labor that are required to complete the Work Order. Picklists will be generated only for the parts on Task Cards that are on that Work Order. The Picklists will then be issued to the Work Order and then associated costs allocated to that work. The following steps are involved in the Work Order Reservation Control process.
The “Back Order Create Flag” will select if the System will create Requisitions for below level P/N's when reserving material for the Work Order. If this is not switched on, the system will only print a list of the “Shortage Items” and the user will then be responsible for ensuring that any parts required are ordered or made available. A queried Work Order can be accessed through the Select The following tabs and buttons are available.
|
|||||||||||
| Top of Page |
Publication Date: 8/17/2026
Share
Print
|
||||||||||