Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Receiving 15.1

Release

Receiving

 

Receiving Inspection Detail, General Tab

15.1

P/N Master Document Control Link button - Select this button to view and documents linked to the part number via the Document Control but_document_ctl_sm button from the P/N Master.

Note: This button is a customized request and may not be available to all customers.

Release

Receiving Securities

 

Receiving Inspection Detail, R/O Control Tab

15.1

  • Security Explorer/ Receiving/ Update/ Receiving Inspection/ Deferred at RI

 

P/N E/C Authorization Button, via Receiving Inspection Detail Buttons

15.1

  • Security Explorer/ Receiving/ Update/ Receiving Inspection/ RI P/N E/C Authorization

Release

Receiving Switches

 

RIAPCRMN

15.1

When set to Yes, the Approved Certificate field is mandatory in the Receiving Inspection, Purchase Order Receiving, P/N Initial Load windows.

When set to No, the Approved Certificate field is not mandatory in the Receiving Inspection, Purchase Order Receiving, and P/N Initial Load windows.

Note: In Trax Version 15 and all later releases, the functionality of this switch has been added to the P/N Initial Load Multi window.

Note: This switch is not new in TRAX Version 15, however functionality was added to the switch in Version 15.

See Also

TRAX 15.1

Engineering 15.1

G/L Interface 15.1

Inventory 15.1

Orders 15.1

Packing and Shipping 15.1

Planning 15.1

Production 15.1

Quality Assurance 15.1

Settings 15.1

Shop 15.1

System Adminstration 15.1

Technical Records 15.1

TraxDoc 15.1

Top of Page Publication Date: 8/17/2026 Share Print