Publication Date: 8/17/2026
Share
Print
|
||||||
Engineering Control Shop, General TabWhen creating a new Shop E/C, or updating an existing Shop E/C, the General tab is where the basic information regarding the Shop E/C is entered. Shop E/Cs will also be available to choose from the Repair Orders or via the Planning module.
When creating a new E/C, if Switch When creating a new E/C, if Switch When updating an existing E/C, if Switch The following information/options are available in this window: Control Type The Engineering Control Type (E/C or Task Card). The Control Types have the same functionality throughout the system (i.e. planning, compliance, effectivity). The Control Type Task Card is used when creating an E/C schedule in order to link it to an existing Task Card (i.e. to apply a schedule to a standalone Task Card). The Control Type Task Card may also be used when importing an aircraft manufacturer's maintenance program into the system, based on the manufacturer's document format and settings selected by the user at the time of the import (i.e. if selections are made to import and create the E/Cs and Task Cards at the same time). If Switch Status The status of the E/C. When creating a new E/C the initial status will default to Pending; if the user requires to hold this E/C until ready it can be left as Pending, or alternatively it can be changed to another status. Applicable/Not Embody - The E/C is applicable to an A/C Type/Series or Part Number, but may not be mandatory. This status allows the E/C to be entered in the system, but does not require compliance. Cancel - The E/C has been cancelled. N/A - The originating document (AD, SB, MOD, etc.) has been evaluated and is deemed not effective to a specific A/C or P/N. Open - The E/C is Open. Pending - This is the default status. This will be the status until the E/C is authorized. If the user requires holding this E/C until ready, it can be left as Pending even after the record has been saved. Once the E/C is authorized the status will show as Open. Rejected - The E/C was rejected or not authorized and may need to be sent back through the authorization process for revision. This status should not be selected manually. Terminated - The E/C is no longer in use. It has either been complied with for all effective aircraft or components, or the action of another E/C has terminated it. When an E/C is terminated, the termination applies to the entire fleet. This status should not be selected manually. Users can receive an email or notes message when any action is performed against an E/C by setting up the notifications through the E/C Category System Transaction Code. For more information, refer to the E/C Category Notifications via the Settings Training Manual. E/C The Engineering Control that specifies aircraft or component scheduled maintenance intervals. The E/C title is user-defined and can be whatever the user requires. It can be a company reference number or the specific AD or SB number or OEM maintenance program designation, which is most commonly used. When Switch When Switch
Category The category of the E/C (e.g., AD, SB, CHECK). The E/C Category System Transaction Code is set up via Settings/ Explorer/ System Transaction Code/ Engineering. E/C Authorization Steps and System Notifications can also be set-up within the E/C Category. The category can be used for searching and reporting data in prints. For more information, refer to the E/C Category via the Engineering Transaction Codes Manual. Sub Category A Sub Category can be used to further define the E/C Category, if applicable. For example, users may want to classify their ADs for Engines, APUs, and Landing Gear separately. The Sub Category System Transaction Code is set up via Settings/ Explorer/ System Transaction Code/ Engineering. Classification The classification of the E/C (i.e. Mandatory, Optional, etc.). E/C classifications can be made mandatory by selecting the mandatory property checkbox in the E/C Mandatory Classification transaction code (via Settings/ Explorer/ System Transaction Code/ Engineering). If a P/N E/C has a classification where the mandatory property checkbox is selected, the system will force compliance at the next vendor or shop repair order visit and cannot be overridden. A part with a mandatory P/N E/C should only be added to a R/O when compliance is required and the work will be accomplished during that repair visit; these P/N E/Cs will not receive automatic compliance upon receipt of the R/O. E/C classifications with the mandatory property checkbox selected will trigger mandatory flags and alerts throughout the system (i.e. planning query results); and when the E/C or P/N E/C planning element checkboxes are selected in the Planning Query, the E/C Classification field appears in the planning filters. For more information refer to the E/C Mandatory Classification via the Engineering Transaction Code Manual. Description The description is the basic title of the E/C. The number of characters is limited in this field and a longer description can be entered in the E/Cs E/C Content Tab. Revision The revision number of the E/C. This can be alpha numeric. When the revision is changed and saved, the system will prompt the user with a revision control record, where the changes made for the specific revision can be saved for auditing purposes. The 'Revised By' field will be automatically updated with the user's user code, and the revision date can be set as required. If Switch Revised By The user who creates and/or authorizes the E/C revision. Date (Revision Date) The date the E/C was put into revision (if E/C is currently in revision), or the date the final authorization step was completed in the E/C revision authorization process. Amendment The amendment field normally relates to AD amendment numbers. This is alpha numeric and issued by the authority or company issuing the P/N E/C. Issued By The vendor or authority (i.e. FAA, JAA Task Card.) who issued the E/C. Issued Date The date the E/C was issued by the vendor or authority. ATA Chapter, Section, Paragraph The ATA chapter/section/paragraph, as applicable. For more information, refer to the ATA Specifications via the Settings Training Manual.
New ATA Chapter, Section, Paragraph Select to add multiple ATA references to the Engineering Control. Each time this button is selected a new set of chapter/section/paragraph fields become available. Delete ATA Chapter, Section, and Paragraph Select to delete any of the selected ATA references for the Engineering Control. Each time this button is selected, the selected set of chapter/section/paragraph fields are deleted. At least one set of ATA chapter/section/paragraph must exist; if there is only one reference remaining, it cannot be deleted. _____________________________________________________________________________________ |
||||||
| Top of Page |
Publication Date: 8/17/2026
Share
Print
|
|||||