11.5 - Engineering Module

Manufacturer Data Import, Airbus Import

The Airbus Import option is used to load information regarding the Constituent Assembly, Equipment, and Conformity to Design Standard into TRAX with each new Airbus aircraft delivery. These different types of files allow for information regarding parts, their positions, E/Cs, etc. to be associated to the specified aircraft. The information is imported through an Excel file with the option to process specific sheets or it can be imported through three separate tab-delimited TXT files as input files. For more information, refer to the Airbus Import, Preparing the Airbus Import Files, and Airbus Import Input.

Manufacture Data Import, MPD Loader, General tab

Sampling drop down: This drop down lists the option of whether or not to apply a sampling schedule of the Engineering Controls being imported to a fleet. This functionality can be utilized through selecting the 'Sampling A/C Flag Only' option, or the import can be conducted without utilizing the functionality through the blank option. This drop down is contingent with the Sampling aircraft registered via A/C Master, Optional 1 tab. The options are as follows:

Sampling A/C Flag Only: Only Sampling Aircraft, as indicated in the A/C Master, Optional 1 tab, will be made effective and have the Sampling Override Schedule applied.

blank/null: Does not apply the sampling schedule of the Engineering Control being imported to the fleet.

For more information, refer to the Override Sampling Schedule button, via Engineering Control Schedule tab.

Rename/Copy Button, via the Task Card Buttons

Task Cards that have been closed on a Work Order cannot be renamed

A/C CTL, via Engineering Control

Note added to the Assign E/C Effectivity by Range button: If the Assign Status by Range has been activated, the user will not be able the set up the Assign E/C Effectivity by Range. The system will display a hard warning.

Note added to the Assign Status by Range button: If the Assign E/C Effectivity by Range has been activated, the user will not be able the set up the Assign Status by Range. The system will display a hard warning.

Note added to the Assign Schedule by Range button: If the Assign E/C Effectivity by Range has been activated, the user will not be able the set up the Assign Schedule by Range. The system will display a hard warning.

See Also