|
TRAX MANUALS > Engineering > Engineering Module - E/C > Engineering E/C, Update Menu > Engineering Control > Engineering Control Buttons > Economic Analysis Button, via Engineering Control
Economic Analysis Button, via Engineering Control
The Economic Analysis button allows for a company to make specifications regarding the financial information associated to Engineering Controls along with relevant Parts and Tools Costing. This feature can help a company estimate what the cost of managing the E/C would be, while accounting for labor, part, and tool requirements.
The following tabs are available:
Note: This window is meant to help analyze customized information that is not directly functional with other windows in TRAX. This window was designed as specified by a TRAX customer and may therefore not be applicable for other TRAX customers.
Note: This window is only accessible when Engineering switch ECVIAREV is set to No.
Note: Depending on the customized prints available to a company, the information presented in this tab may be available through various prints/reports.
|
In This Section Engineering Economic Analysis, E/C Economic Analysis Tab Engineering Economic Analysis, E/C Parts and Tools Costing Tab |
See Also Engineering Control Buttons New Express Button, via Engineering Control Notes Button, via Engineering Control Print Button, via Engineering Control Document Button, via Engineering Control A/C CTL Button, via Engineering Control P/N CTL Button, via Engineering Control Task Card Control Button, via Engineering Control Task Card Button, via Engineering Control Revision CTL Button, via Engineering Control E/C Link Button, via Engineering Control Image Button, via Engineering Control Document Control Button, via Engineering Control Rename/Copy Button, via Engineering Control Change E/C Revision Button, via Engineering Control MPD Button, via Engineering Control Compliance Button, via Engineering Control |
|