Download Online Help
Print
|
||||||
PENDAUTH - WO EC & TC Revision OverrideWO EC & TC Revision Override Affected Window: w_engineering_pending_release
Note: To use either of the options for Switch
Switch Set to Yes: When set to Yes, when a new Work Order Task Card or Engineering Control revision is authorized, overriding conflicting Work Order Task Card or Engineering Control revisions is managed via the Production/Update/Engineering Pending Release window.
The following Task Cards can be overridden from the Engineering Pending Release window.
Switch Set to No: When set to No, the override window is displayed at the Task Card or Engineering Control new revision authorization level.
The following E/C is linked to a Work Order in 'Open' status.
A revision is created for the E/C.
Release the E/C for Authorization.
From the Engineering Authorization Explorer window, select the Authorization button.
From the Engineering Authorization window, select the 'Accept' radio button and save transaction.
From this pop-up window, the user may override the old revision with the new revision by selecting the Override W/O checkbox and selecting the Save button.
|
||||||
| Top of Page |
Download Online Help
Print
|
|||||