ALWMULTTSK - Prevent Element From Being Added to a Work OrderPrevent Element From Being Added To A Work Order Affected Window: w_ac_planning_qry
Note: The functionality of this Switch also applies to the Production Module.
Switch Set to Yes: When set to Yes, all A/C E/Cs, P/N E/Cs, P/N Controls and Defects will be brought on to a Work Order even if the elements are already on an existing Work Order duplicate elements (A/C E/Cs, P/N Controls and Defects).
Go to Planning/ Query/ A/C Planning Query. Query for Defect, A/C E/C, P/N E/C, and P/N Control: Create a new Work Order for one of the elements: Work Order is created: Add the same Work Order to all of the other elements: All elements are added to the Work Order: The Non-Routine Task Card for the Defect is added as well: The same E/C that was added to the W/O is a added to an existing Work Order. The system issues a soft warning stating that the following E/C is already associated to an existing Work Order: The system allows the user to save the E/C to a separate Work Order:
Switch Set to No: When set to No, an element (i.e A/C E/C, P/N E/C, P/N Control or Defect) will not be brought onto a Work Order if it already exists on another Work Order.
A new Work Order is created for the same elements used in the above example: When the user attempts to add element to a Work Order via Production (in this example an A/C E/C) that already exists on an Work Order that is in Open or Completed status, the system will generate the following error: |
||||||