PN_EC_INSTDAYS - Count P/N E/Cs by E/C's Calendar Days or Part's Installed Days

Count P/N E/Cs by E/C's Calendar Days or Part's Installed Days

Affected Window: w_ac_planning_qry

 

The following is how Planning will calculate the P/N E/C Due Date with each switch setting.

 

Switch Set to Yes:

When set to Yes, the Calendar Days checkbox is available for P/N E/Cs in the E/C, Schedule tab and for the specific P/N Serial Number via the Engineering Effectivity Override. When the Calendar Days checkbox is selected, Planning calculates the P/N E/C's Due Date based on the Calendar Days starting from the E/C's Effective Date. When the Calendar Days checkbox is not selected, Planning calculates the P/N E/C's Due Date starting from the associated part's Installed Date (if the part's installed date is after the P/N E/C's Effective Date).

eMRO_Planning_Yes

Calendar Days Checkbox NOT Selected:

Notice that the following E/C has an Effective Date and a schedule with a particular number of Days.

Also notice that the Calendar checkbox is not selected.

The following P/N is then linked to the E/C (making it a P/N E/C).

The following specific Serial Number is then linked to the P/N E/C's schedule. Notice that compliance has not yet been met.

Also notice that, while the Calendar Days checkbox is available via the override window for the P/N S/N, the checkbox remains deselected.

The P/N S/N was installed on the specified year.

Planning Query is then run for the P/N E/C. Because the Calendar Days checkbox is not selected, the Due Date for the P/N E/C is based on the part's Installed Date.

The Due Date is therefore the particular number of Days after the part's Install Date.

Note: If the part was installed on the Aircraft prior to the P/N E/C's Effective Date, then planning will count from the E/C's Effective Date, not from the part's installed date.

 

Calendar Days Checkbox Selected:

Now the Calendar Days checkbox is selected for the same P/N E/C (which is available via the E/C, Schedule tab or via the override window for the P/N S/N).

Planning Query is then run for the P/N E/C. Because the Calendar Days checkbox is selected, notice that the Due Date is calculated based on the amount of days since the P/N E/C Effective Date.

The Due Date is therefore the particular number of Days after the E/C's Effective Date.

 

Switch Set to No:

When set to No, Planning will calculate P/N E/C Due Dates based on the Calendar Days starting from the E/C's Effective Date. While the switch is set to No, the Calendar Days checkbox in not visible and the system functions as though it is always selected.

eMRO_Planning_No

Note: When set to No, the mixed schedule functionality is activated. Therefore, if existing E/Cs accrue time while this switch is set to Yes and is later switched to No, utilizing a schedule of hours/cycles mixed with days will require you to contact Customer Support to review your data for optimal accuracy. This additional precaution is only required when switching from Yes to No settings. This precaution is not required for newly created E/Cs that have yet to accrue time/data.

Notice that the following E/C has an Effective Date and a First Schedule of a particular number of Days.

Also notice that the Calendar checkbox is not available because the switch is set to No.

The following P/N is then linked to the E/C (making it a P/N E/C).

The following specific Serial Number is then linked to the P/N E/C's schedule. Notice that compliance has not yet been met.

Also notice that the Calendar Days checkbox is not available.

The P/N S/N was installed.

When Planning Query is run for the P/N E/C, notice that the Due Date is calculated based on the amount of days since the P/N E/C Effective Date, not the part's Installed Date.

The Due Date is therefore a particular number of Days after the E/C's Effective Date.

See Also

Planning Switches

ACROLAVG - Use A/C Rolling Average for Mean Hours and Cycles

ALWMULTTSK - Prevent Element From Being Added to a Work Order

APUMEAN - Mean APU Calculation

CPYSCHFROMTRANS - Use Planning Transaction Schedule for T/Cs on Work Orders with a Line Status

DUEATPRJCT - Project the Due At Hours and Cycles Using the Mean Hours and Cycles

EMPATTSEQ - Employee Attendance Sign-On / Sign-Off Next Sequence

INTERACTPLANMANHOURS - Interactive Planner Displays Man Hours per Location/Site

LBRBYHCNT - System Labor by Head Count

LivePlan - Enables the Live Planning Functionality

MANHOURSAUTOCOMP - Auto Complete Certain Fields in Man Hours Schedule Override

MANPLNFLF - Default Man Hour Schedule Planner to Location/Site of the Employee

MELDEFLOC - Deferred Defect Convert Reported/Deferred Day to Local Time Zone

OVNDATADAYS - Define Number of Days to Display in Overnight Station Report Tab

OVNTACMS - Overnight Station Default

PASTASCH - Create Past Absence Record

PLANBY - Allows You to Set Planning to Weekly or Monthly

PLANDEPT - Planning Department and Planning Sub Department Fields Mandatory

PLANDUE% - Planning Warning When Percent Due

PLANPNSEQ - Planning P/N Next Sequence Number

PLNAUTO7D - Activate Seven Day Forecast Automatically at Set Interval

PLNHISTML - Determine Planning History Time Limit

PLNJOBACNO - Activate Planning Job

PLNTRNNO - Planning Transactions Sequence Number Can Only Be Changed By The Application

SCHEDULEWORKG - Allow Work Group Selection Filter

SELFSCHLM - Self Assignment Schedule Date Range Limit

SHOPCAPNOT - Do Not Validate Against Shop Capability in the Shop Resource/Tasks Planner

SHPPLNDLF - Default Shops Resource/Tasks Planner to the Location/Site in Employee Master

TOEXITMS - Turn Off Exit Pop Up Message in Planning Query

TOOLWARN - Issues Warning If Tool Expires During W/O Scheduled Date Range

Top of Page Download Online Help Print