Interactive Planner GenerationBefore utilizing the Interactive Planner, various processes must be conducted along with specifications that need to be made in the A/C Planning Query. The following is the basic life cycle of the Interactive Planner, particularly the generation:
The various processes that must be conducted to provide information that can be utilized in the specifications of the A/C Planning Query include the following:
After the various processes have been conducted and the specifications of the A/C Planning Query have been made, the different sections of the Interactive Planner can be utilized, as needed. These sections include the following:
|
||||||