Planning Control

8.1

Compliance Tab, via E/C Detail

 

The Compliance tab displays an Engineering Control's last 10 compliance records in a query view.

8.1

Configuration Toolbar, via Planning Control

 

If multiple A/Cs are selected, the number selected appears just above the A/C filter dropdown.

 

Defect Fields, via Due List

8.1

Defect Icon for MEL - This icon displays among the defect fields in the Due List planning results when an MEL category has been provided.

8.1

Defect Type - The type of defect found on the aircraft (for example, Pilot Report, MX Report).

8.1

Defer - Reason for the defect deferment; for example MEL, Dent, No Parts, WATCH item, etc. This field is part of the functional System Transaction Codes and contents embedded functionality which includes authorization requirements, default requisition prompts and defaulted MDDR closings.

8.1

Defer Category - Category of the deferment. This is the reference if the deferral is operational, or performance related. This field may be used to reference if the deferral is related to a General Maintenance Manual or a Standard Practice Manual.

8.1

MDDR - This is also known as a Deferred Maintenance Item (DMI). This field allows users to enter the deferment on one defect report (aircraft log page) by using the MDDR number on another defect report (aircraft log page) so that the user may resolve the MDDR.

 

Details Tab, via W/O

8.1.1

Expenditure - The following functionality was added:

Search - To search the expenditure categories, type in the box just below the expenditure filter. The expenditure order will appear alphabetically by default.

 

Due List, via Planning Control

8.1

A/C (From / To) section added to select an A/C (A/C and Type/Series) range.

8.1

E/C Schedule Control - Select the E/C Schedule Control drop-down to filter the query by Child and/or Parent E/Cs. If the Parent E/C checkbox is selected, only Parent E/Cs are displayed. If the Child E/C checkbox is selected, only Child E/Cs are displayed. If both options are selected, both Parent and Child E/Cs are displayed. If no selection is made, all E/Cs are displayed, including those without a Called-on setup.

8.1

E/C (Task) Transfer Confirmation - A confirmation window has been added to prompt a user to confirm an E/C (Task) transfer, via the W/O Workscope tab, Transfer button.

8.1

Last Occurrence, via Due List - The Last Occurrence indicator appears on the final occurrence of a planning element when multiple occurrences are calculated. To display multiple occurrences, the Calculate Multiple Occurences for the Next checkbox must be selected in the Planning Actions section of the Due List. The Occurrence number is displayed at the bottom of each planning element occurrence. The number of occurrences listed is controlled by the Occurrence Count field in the Planning Actions section of the Due List.

8.1

Multiple Occurrences for the Next checkbox - The following functionality has been added:

And/Or Operator - Select the And/Or operator to specify how multiple occurrences should be calculated based on the time span and the occurrence count.

And option: Calculates occurrences based on both the time span and the occurrence count.

Or option: Calculates occurrences that meet either the time span or the occurrence count.

Occurrence Count - The number of occurrences to display, if available.

8.1

Spare Forecast checkbox - The following functionality has been added:

Note: The Spare Forecast checkbox must be selected for the Spare, Tools, and Reservation checkbox filters to be enabled. When selected, these checkboxes change the corresponding icon (Part Availability, Tool Availability, or Reservation Status) next to each checkbox. Users can click the Part, Tool, or W/O Reservation checkbox/icons to select the status they want to filter by. These checkboxes operate in an OR relationship. When checked, a Part Availability icon and/or Tool Availability icon appears next to all items in the Due List results that require parts from inventory to be accomplished. The Part Availability or Tool Availability icon appears in one of three colors to indicate the current availability (see below for details). If the Spare Forecast checkbox is not selected, these icons do not appear in the Due List results.

Spare checkbox - The following functionality has been added:

Note: The Spare checkbox allows users to filter the query by Part Availability Status (i.e., Available Part Availibity Green_Planning Control, Partial Part Availibity yellow_Planning Control, or Unavailable Part Availibity Red_Planning Control).

Tool checkbox - The following functionality has been added:

Note: The Tool checkbox allows users to filter the query by Tool Availability Status (i.e., Available Planning Control-Tool Status green, Partial Planning Control-Tool Status yellow, or Unavailable Planning Control-Tool Status red).

Reservation checkbox - The Reservation checkbox allows users to filter the query by W/O Reservation Status (i.e., Reserved Planning Control-Reservation-green, Partially Reserved Planning Control-Reservation-yellow, None Reserved Planning Control-Reservation-red, or Tasks Added None Reserved Planning Control-Reservation-blue).

 

Due List Buttons, via Planning Control

8.1

Filter History button - Select the Filter History filter history button button to access pre-existing filters historically used in the system.

 

Filters, via Planning Control

8.1

The user can check or uncheck the Private checkbox to save the filter as private when checked, or public when unchecked.

 

Interactive Planner, via Planning Control

8.1

Calculate Remainings checkbox - Selecting this checkbox modifies the Work Order Hoverbox that appears when hovering over a Work Order. The hoverbox will display Remaining Calculations for the maintenance events linked to the Work Order (E/Cs, P/N E/Cs, etc.) in addition to the default information.

8.1

Control plan-Control icon Icon - The following functionality has been added:

Note: The Control plan-Control icon Icon has been changed to the P/N Control but_PC blue icon_planning control icon.

P/N Control but_PC green icon_planning control icon - Indicates that the P/N Control has been packaged into a W/O.

P/N Control but_PC blue icon_planning control icon - Indicates that the P/N Control is not overdue and has not packaged into a W/O.

P/N Control but_PC red icon_planning control icon - Indicates that the P/N Control is overdue.

8.1

Defect plan-Defects icon Icon - The following functionality has been added:

Defect but_D green icon_planning control icon - Indicates that the defect has been packaged into a W/O.

Defect plan-Defects icon icon - Indicates that the defect is not overdue and has not packaged into a W/O.

Defect but_defect red_planning control icon - Indicates that the defect is overdue.

8.1

E/C plan-EC icon Icon - The following functionality has been added:

E/C but_E green icon_planning control icon - Indicates that the E/C has been packaged into a W/O.

E/C plan-EC icon icon - Indicates that the E/C is not overdue and has not packaged into a W/O.

E/C but_E red icon_planning control icon - Indicates that the E/C is overdue.

8.1

P/N E/C but_PE blue icon_planning control icon - Indicates that there is a Part Number Engineering Control associated with the A/C. Hover over the P/N E/C but_PE blue icon_planning control icon to view the E/C, P/N, S/N, and Description. This icon is visible when the Display Packaged Tasks and/or the Display Unpackaged Tasks checkboxes are selected. Select the P/N E/C but_PE blue icon_planning control icon to view the E/C Detail window.

P/N E/C but_PE green icon_planning control icon - Indicates that the P/N E/C has been packaged into a W/O.

P/N E/C but_PE blue icon_planning control icon - Indicates that the P/N E/C is not overdue and has not packaged into a W/O.

P/N E/C but_PE icon_planning control icon - Indicates that the P/N E/C is overdue.

8.1

W/O Indicators - Dragging and dropping a work order within the planner to a date and time subsequent to a flight causes the work order location to update and match the arrival location of that most recent scheduled flight. If any picklists or requisitions were created in the previous location, then they are canceled automatically.

8.1

Work Order Scheduled Start Time - The scheduled start time appears in both local and Zulu time.

8.1

Work Order Location - The location of the work order is displayed.

8.1

Work Order Scheduled End Time - The scheduled end time appears in both local and Zulu time.

8.1

Work Order Hoverbox - Hovering the cursor over a work order causes a floating work order details hoverbox to appear. The hoverbox has the following details: W/O; Status; A/C; Location; Start Time; End Time; Duration; Ground Time; Description. If the Calculate Remainings checkbox is selected, Remaining Calculations will also appear.

 

NHA NLA Fields, via Due List

8.1

NHA S/N - Next Higher Assembly (NHA) serial number.

 

List View, via Due List Planning Results

8.1

Overdue - For an overdue E/C, the word "Overdue" appears highlighted in red, and the day and time appear highlighted in orange.

 

Part Status Indicator Button, via Due List

8.1

Note: When a row is selected in the Parts/Tools table, the local quantities for the selected part displays.

 

Parts Tab, via W/O

8.1.1

Reservation Status Indicator - The icon inside the Parts tab indicates the current reservation status for the W/O. This allows users to quickly see a Work Order's part reservation status (all, partial, none, etc.).

Reservation Status Planning Control-Reservation-green Indicator - All parts have been reserved for the Work Order.

Reservation Status Planning Control-Reservation-yellow Indicator - Some parts have been reserved for the Work Order.

Reservation Status Planning Control-Reservation-red Indicator - No parts have been reserved for the Work Order.

Reservation Status Planning Control-Reservation-blue Indicator - Task have been added to the original Work Order and parts have not yet been reserved for those tasks.

8.1

Pending E/C Revision Icon, via Due List

 

The Pending E/C Revision but_pending rev_planning control icon appears if an Engineering Control has a revision pending authorization. The E/C's revision number is displayed below the icon.

8.1

Sampling Schedule Indicator, via Due List

 

The Sampling Schedule Indicator appears when an E/C schedule is driven by an Override Sampling Schedule. This is configured from the Override Sampling Schedule button in the Engineering Control Schedule tab. For more information, refer to the Override Sampling Schedule button in the Engineering Training Manual.

8.1

SDC Query Window

 

The SDC Query window has been added, offering SDC data, recorded in eMRO and subsequently interfaced with the Rolls Royce QOCO system.

 

Table View, via Due List Planning Results

8.1

Task - the following updates were made to this column: Note: This is two columns, Task Type and Task, the latter of which lists the event number.

8.1

Schedule - the following updates were made to this column: Note: This is three columns, Schd Hrs, Schd Cycs, and Schd Days.

8.1

Actual - the following updates were made to this column: Note: This is three columns, Act Hrs, Act Cycs, and Act Days.

8.1

Remaining - the following updates were made to this column: Note: This is three columns, Rem Hrs, Rem Cycs, and Rem Days.

8.1

Due at A/C - the following updates were made to this column: Note: This is two columns, Due At AC Hrs and Due At AC Cycs.

8.1

The following fields were added to the Table view:

  • W/O Location
  • W/O Site
  • W/O Start Date
  • W/O Start Hr
  • W/O Start Min
  • W/O End Date
  • W/O End Hr
  • W/O End Min
  • Defect Type
  • MDDR
  • Defer
  • Defer Category
  • EOM

8.1

Task Cards Tab, via W/O (Planning Control)

 

Task Cards tab - The Task Cards tab lists all Task Cards that are associated with the W/O.

 

Exchange button - The Exchange button was added to the window to allow the replacement of a Task Card with a revised version of the same Task Card.

 

Tools Tab, via W/O

8.1

Reservation Status Indicator - The icon inside the Tools tab indicates the current reservation status for the W/O. This allows users to quickly see a Work Order's tool reservation status (all, partial, none, etc.).

Reservation Status Planning Control-Reservation-green Indicator - All parts have been reserved for the Work Order.

Reservation Status Planning Control-Reservation-yellow Indicator - Some parts have been reserved for the Work Order.

Reservation Status Planning Control-Reservation-red Indicator - No parts have been reserved for the Work Order.

Reservation Status Planning Control-Reservation-blue Indicator - Task have been added to the original Work Order and parts have not yet been reserved for those tasks.

 

W/O Flag, via Due List

8.1.1

Note: The Schedule/Actual/Remaining section does not appear for Work Orders; only the Remaining section is shown for W/O planning elements. Additionally, the 'Remaining' section was renamed to 'Work Scope Remaining', which applies exclusively to W/O planning elements.

8.1.1

Restricted At - The Restricted At field displays the Due At A/C Cycles or Hours for the planning element in the W/O with the earliest schedule.

 

Workscope Tab, via W/O (Planning Control)

8.1

Hide Child E/C emro_but_hide button - Select to hide the child E/Cs. The button will be replaced by the Show Child E/C emro_but_show button.

8.1

Show Child E/C emro_but_show button - Select to show the child E/Cs. The button will be replaced by the Hide Child E/C emro_but_hide button.

8.1

Due Date - The following was added to this column: Note: The specific due time is listed along with the Due Date (to the right of the date).

Switches

8.1

PLNDLDFSPFCST - When set to Yes, the Spare Forecast checkbox (under the Planning Actions section in Planning Control) is selected by default when loading the Due List window. When set to No, the Spare Forecast checkbox remains deselected.

8.1

PLNTIMEZN - When set to Yes, the date/day-driven schedules are due at the end of the day for the selected time zone. The time zone is entered in the Config Other field in the switch Configuration tab. The selected time zone must be supported by Oracle; the list of supported time zones can be obtained from the V$TIMEZONE_NAMES view. When set to No, the system uses the default due date calculation for date/day-driven schedules; the due date is defined as the end of the day in UTC (Coordinated Universal Time).

8.1

PLNDUELISTALL - When the switch PLNDUELISTALL is set to Yes, the All option is enabled for the Paginator in the Planning Control Due List window. When set to No, the All option is not enabled for the Paginator in the Planning Control Due List window.