Planning Switches

The Planning module brings together the Engineering, Technical Records, Operations Schedule and Inventory information into one place, which then feeds more information into the Production module. This allows complete interrogation of the information relating to aircraft and component work.

Aircraft or part checks, inspections, modifications and maintenance can be forecast, and work specifications produced online in real time.

Deferred Defects on the aircraft can be monitored within this module, along with all other aircraft related time controlled items.

Options in Planning include Aircraft Planning, which is the mainstay of the Planning module; this allows interrogation of the Planning information on-screen, in different formats according to the user’s requirement. Additional reporting is available to show costs, and to overlay the material requirements for planned items against current and proposed inventory. Full integration gives major benefits in this area, providing mix and match of the information from all the relevant modules to give an effective scheduling and project management tool. The graphical planning query provides a very high capability by overlaying aircraft flight schedules with the maintenance work packages taking into account the available manpower, hangar capacity and spares/tools availability.

The A/C Flight schedule can be entered on the system, this will allow the maximum accuracy when forecasting and when controlled items become due. (Schedules can be downloaded from other flight planning systems), otherwise average utilization is employed for the calculation of due dates.

Man-hour Schedules can be entered, such as shift patterns and weekly working patterns. This then provides information for capacity planning and allows employees to be ‘reserved’ against work to be performed. Site Capacity Planning can be carried out.

 

Configuration switches allow administrators to modify specific features. Each module contains its own set of switches which can be found via System/Explorer/System Transaction Configuration.

In This Section

ACPLANQ - A/C Planning Query Fast Mode

ACROLAVG - Use A/C Rolling Average for Mean Hours and Cycles

ALWMULTTSK - Prevent Element from being Added to a Work Order

APUMEAN - Mean APU Calculation

AUTOWONHADESC - Enables Auto W/Os generated via Planning to automatically include NHA P/N, S/N and Position Info

AUTOMANHOURSCHEDULE - Allow AUTO_MANHOUR_SCHEDULE_JOB to Appear in Trax Database Jobs

AUTOTSKPRIORITY - Enable Auto Task Priority Functionality

CHILDECNOSH - Show Child E/Cs With No Schedule in A/C Planning Query

CPYSCHFROMTRANS - Use Planning Transaction Schedule for TCs on Work Orders with a Line Status

DUEATPRJCT - Project the Due At Hours and Cycles using the mean hours and cycles

EMPATTSEQ - Employee Attendance Sign-On / Sign-Off Next Sequence

INTERACTPLANMANHOURS - Interactive Planner Displays Daily Man Hours per Location/Site

LBRBYHCNT - System Labor by Head Count

LivePlan - Enables the Live Planning Functionality

MANHOURSAUTOCOMP - Auto complete certain fields in Man Hours Schedule Override

MANPLNDLF - Default Man Hour Schedule Planner to Location/Site of the Employee

MELDEFLOC - Deferred Defect Convert Reported/Deferred day to Local Time Zone

OVNDATADAYS - Define Number of Days to Display in Overnight Station Report Tab

OVNTACMS - Overnight Station Default

PASTASCH - Create Past Absence Record

PLANBY - DO NOT CHANGE FROM NO Capacity Planning By: Week = (YES) or Month = (NO)

PLANDEPT - Planning Department and Planning Sub Department fields Mandatory

PLANDUE% - Planning Warning When Percent Due

PLANPNSEQ - Planning P/N Next Sequence Number

PLNAUTO7D - Activate Seven Day Forecast Automatically at Set Interval

PLNHISTML - Determine Planning History Time Limit

PLNJBDFLT - Default Planning Job Checkbox

PLNJOBACNO - Run Planning Jobs by Program Instead of Oracle Scheduler

PLNJOBQUE - Activate Planning Job by Java Queue

PLNTRNNO - Planning Transactions Sequence Number can only be changed by the TRAX Application

PLNWSHDCHLD - Hide Child E/C on Planning Control Workscope by Default

PN_EC_INSTDAYS - Count P/N E/Cs by E/C's Calendar Days or Part's Installed Days

SCHEDULEWORKG - Allow Work Group Selection Filter

SELFSCHLM - Self Assignment Schedule Date Range Limit

SHOPCAPNOT - Do Not Validate Against Shop Capability in the Shop Resource/Tasks Planner

SHPPLNDLF - Default Shops Resource/Tasks Planner to the Location/Site in Employee Master

STREAMLINE - Clean Up Employee Schedules

TOEXITMS - Turn Off Exit Pop Up Message in Planning Query

TOOLWARN - Issues warning if tool expires during W/O scheduled date range

See Also

Planning

Planning Module

Planning Transaction Codes